Composite Materials Systems - Classification and Qualification
Home Background Qualification Scheme Classification Scheme Quality Control Protocols and Acceptance Outputs and Downloads Links

Technical Report No. 8 - Case Studies

    Download complete report (80 page pdf document)

    or individual case studies from the report:

   Overview

1. St Thomas' Hospital

2. Trenchard Street Multistorey Car Park

3. Maunders Road Bridge

4. Ealing Road Bridge

5. St. Micheal's Road Underbridge

6. New Moss Road Overbridge

7. Brockley Slip Roads

8. QAFCO PRILL Tower

9. Hammersmith Road Bridge

 

Technical Report No 9 – Application Guide

    Download report  (pdf document)


Project Overview

    Download (pdf document)

QC Procedures

Please click on the links below to download procedure sheets.
Files are in PDF format.

Procedures for sample preparation for off-site testing


Procedures for conducting on-site QC tests

 

Classification

 

Website designed and maintained by PC Net Services. This page last updated: March 14th, 2007

Outputs and Downloads

The following documents are in pdf format. If you do not have a PDF reader then click here to download one for free.